Year: 2024
Location: Noviny pod Ralskem
In 2024, our ZEKAN L cable manhole including 3 cast-iron hatches was used at the ČEZ Noviny pod Ralskem site, representing an innovative step in optimizing the infrastructure and management of cable networks.

In 2024, our ZEKAN L cable manhole including 3 cast-iron hatches was used at the ČEZ Noviny pod Ralskem site, representing an innovative step in optimizing the infrastructure and management of cable networks.
In 2024 our cable manhole ZEKAN L including 3 cast iron hatches was used in the ČEZ Noviny pod Ralskem area